The Publish DWF Files task automates publishing 3D DWG files from Autodesk Inventor models and 2D DWF files from Autodesk Inventor drawings. The options for 2D and 3D DWF files are different, so these file types are segregated in the file filters.
Use the Publish DWF Files task manager to translate Autodesk Inventor LT files (.ipt, .dwg, .idw) into DWF format.
Select files only on the local computer.
Procedures
Translate files to DWF
In the Autodesk Inventor LT Task Scheduler window, click Publish DWF Files.The information in the task list switches accordingly, and shows any Publish DWF Files tasks you saved previously.
- In the Autodesk Inventor LT Task Scheduler window, right-click and select Create Task
Publish DWF Files. - Click Add Files or Add Folder. Specify the files or folder on your local computer for the task.
In the Open dialog box, specify the files of type:
- Autodesk Inventor Parts (*.ipt)
- Autodesk Inventor Drawings (*.idw, .dwg)
The files and folders you select are listed in Input Folder and File Name columns.
If your selection is a folder, to include subfolders, click the corresponding level of the Recursive column. To specify a different file type within the folder to include in the task, change the entry in the File Name column.
If necessary, repeat the steps to add files and folders.
- In the Task Properties box, enter a task name and a time-out threshold.
- Specify a schedule, or select the Immediately option.
- In Log File, leave the check box selected for the default, or
- Enter an existing folder and a file name to overwrite the default. If the log file does not exist, it is created.
- Click Browse to find and select an existing file.
- To specify no log file, clear the check box.
- Click Options.
- In the Publish Options dialog box, set the options to apply to the files in the task. If you do not set the options, a default set of options is used. Click OK.
- In the Publish DWF dialog box, click OK.
NoteThe output file name is the input file name with the .dwf extension.
If it is the first task you create during the current session, the Authentication dialog box is displayed. Enter your Microsoft Windows login name and password.
The task is displayed in the task list. You can close the Autodesk Inventor LT Task Scheduler window. The task runs as scheduled.
References
Publish DWF files
Creates and edits tasks that translate Autodesk Inventor LT files (*.ipt, *.idw, *.dwg) located on the local computer into DWF format.
| Access: |
|---|
| | - In the Autodesk Inventor LT Task Scheduler main menu, click Create Task
Publish DWF Files. - In the Autodesk Inventor LT Task Scheduler window, right-click and select Create Task
Publish DWF Files.
|
Task box
| | Add Files | Displays the Open dialog box, where you can select files to add to the task. |
| | Add Folder | Opens the Browse for Folder dialog box where you select a folder. Includes subfolders if the corresponding level of the Recursive column is selected. In the File Name column, the file type controls which file type within the folder to include in the task. Can be edited. |
| | Delete | Deletes selections from the list of added files, and folders. |
| | Recursive | Indicates whether to include subfolders in the selection. |
| | Input Folder | Lists the folders for the current task. |
| | File Name | Specifies the file name or extension to identify the files within a folder to include in the task. You can change the file type only if you select a folder. A click in this cell reveals an arrow. Click the arrow for a list of available file types from which to choose. |
| | Output Folder | Indicates the location of the published DWF files. A click in this cell reveals the browse command to display the Browse for Folder dialog box. |
| | Output File Name | Specifies the file name to apply to files within the output folder. You can use the default name, or enter a name. |
Task Properties box
| | Task Name | Assigns a name to the task. |
| | Frequency | Specifies how often to execute the task. Not available if the Immediately option is selected. |
| | Time Out | Specifies the maximum time a task can run before it is terminated. |
| | Immediately | Select to run a task immediately when you click OK. When you select Immediately, Frequency, Start Time, and Start Date are not available. The Authentication dialog box is not displayed. Ownership of the task is not displayed in the task list. If you enable this task later to reuse it, the Authentication dialog box is displayed. You become the owner when you enter your Windows log in name and password. |
| | Start Time | Specifies a time to start the task. Not available if the Immediately option is selected. |
| | Start Date | Specifies a date to start the task. Not available if the Immediately option is selected. |
| | Log File | Specifies whether to log this task. If selected, specifies the name of the log file folder. Use the default name and location, or browse to a different existing folder. If a specified log file does not exist in the selected folder, it is created. Overrides the log file specified in the Task Scheduler window in Settings Options Log File Options. |
| | Add time stamp to log file | Select to: - Add a time stamp to the log file
- Create a log file each time you run a task.
- If you schedule a task for a later time, the log file name is displayed in the Log File edit box. The report window shows a place holder without a hyperlink, as the log file is not created until you run the task.
When not selected, the behavior of the hyperlink remains unchanged. |
Options | Opens the DWF Export Options dialog box where you specify options to apply to all files in the task. |
Publish DWF Options
Specifies advanced options to apply to all files selected for a task that publishes DWF files.
| Access: |
|---|
| | In the Publish DWF files dialog box, select a file, and then click Options. |
Part Setting
Publish Component properties | Includes component properties in the published DWF files. |
Publish Mass properties | Includes mass properties in the published DWF files. |
Password protect published DWF file | Requires a password to read the published DWF files. |
Drawing Setting
Current sheet only | Publishes only the current sheet. |
All sheets in the Drawing | Publishes all sheets in the drawing. |
Log files
Log files save the task processing information so you can understand how the task progressed.
Log file information common to any task type
Error message | Recommended Action |
Failed to open file using Apprentice Server. | Check the input files and verify the format of added files can be read by Autodesk Inventor LT, and run the task again. Open and save the input files in Autodesk Inventor LT before you start the task. |
File does not exist. | Verify the input files exist in the destination folder just before the task runs. The contents of the folder might have changed from the time the task was scheduled to the time the task started to run. |
File has unresolved references. | Clear the option Skip files with resolved reference in the Migration or Update task before you run the task. Open the input file in Autodesk Inventor LT to set the file references correctly, save the document, and then run the task again. |
File is read-only. | Remove the read-only property of input files and run the task again. |
Log file information unique to task types:
Migrate Files, Update Design
Log interpretation information
- Open Time in seconds (column 5).
- Update Difference between the number of comatose (column 5) and sick (column 6) features before and after the update.
- Rebuild Difference between the number of comatose (column 5) and sick (column 6) features before and after the rebuild all.
- Check Difference in the volume from when it was opened up to the point after the update and rebuild are done (column 5).
- Save Time in seconds and the difference in file size (byte) before and after save (column 6).
- Close Time in seconds (column 5).
Operations results table Operation types lead the rows and operation results lead the columns. The header and footer mention the build number before and after migration:
Operation column Specifies the sequence of the various operations Task Scheduler performs to process the task.
- Open Opens the file in a 'migrated to' version in Autodesk Inventor LT.
- Update Updates the old file to the new Autodesk Inventor LT version. Regenerates only the geometry that has significant edits in memory. This could change the file size.
- Check Checks for the mass properties before and after migration of the file.
- Save Saves the file to the migrated version.
- Close Closes the files after migration.
- Purge Deletes the previous versions of the migrated file from the Old Version folder after the migration task ends
Failures and Recommended Solutions
Operation That Failed | Cause of Failure | Recommended Action |
Open | Active security tools or applications. | Disable the security tools and applications and then rerun the task. |
| | Other applications are running when you begin the task. | Close any applications which could terminate the Autodesk Inventor LT Task Scheduler process, and then run the task again. |
| | Other unfinished operations are running in Autodesk Inventor LT when you begin the task. | Close Autodesk Inventor LT, verify there is no Autodesk Inventor LT process footprint left in the Task Manager, and then run the task again. |
Update | Autodesk Inventor LT cannot update versions of files older than R6. | Verify your files are in a version of R6 or later so that they are current enough to be updated. |
| | Autodesk Inventor LT failed to update the files. | Rebuild the failed files in Autodesk Inventor LT to get more information about the failure. In Migration options, check Total Rebuild, and then run the task again. |
Check | Mass properties before and after migration do not match. | Open the files in Autodesk Inventor LT and save them to migrate to the current version or get more information about the error. |
Save | Another process is running that may use the files being migrated. | Close all processes that may use the added files, and rerun the task. |
| | Files are set to non-write status. | Set write permissions on the files. |
| | Please use Rebuild instead of Update. | In the Migration options dialog box, select the Total Rebuild option, and then run the task again. |
Close | Other unfinished operations are running in Autodesk Inventor LT when you begin the task. | Close Autodesk Inventor LT, verify there is no Autodesk Inventor LT process footprint left in the Task Manager, and then rerun the task. |
Purge | Failure. | Purge the Old Versions folder manually after the migration task is finished. |
Publish DWF Files, Export Files, Convert IDW to DWG
Operations results table Operation types lead the rows and operation results lead the columns:
Operation column Specifies the sequence of operations that Task Scheduler performs to process the task.
- Get Translator Gets the appropriate translator in Autodesk Inventor LT based on the file type to prepare for translating the input file to a different output format.
- Open Opens the file in the current version of Autodesk Inventor LT.
- Export Translates the input file to the output format.
- Close Closes the files after exporting.
Failures and Recommended Solutions
Operation That Failed | Cause of Failure | Recommended Action |
Open | Active security tools or applications. | Disable the security tools and applications and then rerun the task. |
| | Other unfinished operations are running in Autodesk Inventor LT when you begin the task. | Close Autodesk Inventor LT, verify there is no Autodesk Inventor LT process footprint left in the Task Manager, and then rerun the task. |
Export | Failure. | Create an update task to rebuild the files, and then rerun the task. Create a new export task to export the files again. |
Close | Other unfinished operations are running in Autodesk Inventor LT when you begin the task. | Close Autodesk Inventor LT, verify there is no Autodesk Inventor LT process footprint left in the Task Manager, and run the task again. |
Print Files
Operations results table Operation types lead the rows and operation results lead the columns:
Operation column Specifies the sequence of operations that are performed by Task Scheduler to publish the file.
- Open Opens the file in the current version of Autodesk Inventor LT.
- Get Manager Gets the appropriate Autodesk Inventor LT print manager API for printing the input documents.
- Set Options Sets the print options and sends them to the selected printer.
- Print Sends the input files to the selected printer and executes the print operation.
- Close Closes the files after printing.
Failures and Recommended Solutions
Operation That Failed | Cause of Failure | Recommended Action |
Open | Active security tools or applications. | Disable the security tools and applications and then rerun the task. |
| | Other unfinished operations are running in Autodesk Inventor LT when you begin the task. | Close Autodesk Inventor LT, verify there is no Autodesk Inventor LT process footprint left in the Task Manager, and run the task again. |
Get Manager | Autodesk Inventor LT installation problems. | Verify that Autodesk Inventor LT is installed and running properly, and then run the task again. |
Set Options | Autodesk Inventor LT installation problems. | Verify that Autodesk Inventor LT is installed and running properly, and then run the task again. |
Print | Printer problems can cause a failure. | Check the printer settings and connection. |
Close | Other unfinished operations are running in Autodesk Inventor LT when you begin the task. | Close Autodesk Inventor LT, verify there is no Autodesk Inventor LT process footprint left in the Task Manager, and then rerun the task. |
Import Files
Operations results table Operation types lead the rows and operation results lead the columns:
Operation column Specifies the sequence of operations that are performed by Task Scheduler to process the task.
- Get Translator Gets the appropriate translator in Autodesk Inventor LT based on the file type to prepare for translating the input file to the output format.
- Open Opens the file in the current version of Autodesk Inventor LT.
- Import Translates the input file to the output format.
- Close Closes the files after importing.
Failures and Recommended Solutions
Operation That Failed | Cause of Failure | Recommended Action |
Get Translator | Translator add-in is not loaded. | Open Autodesk Inventor LT and verify you have the corresponding translator add-in loaded. |
Open | Active security tools or applications. | Disable the security tools and applications and then run the task again. |
| | Other unfinished operations are running in Autodesk Inventor LT when you begin the task. | Close Autodesk Inventor LT, verify there is no Autodesk Inventor LT process footprint left in the Task Manager, and then run the task again. |
Import | Failure. | Verify that the files to import are compatible with the current version of Autodesk Inventor LT. |
Close | Other unfinished operations are running in Autodesk Inventor LT when you begin the task. | Close Autodesk Inventor LT, verify there is no Autodesk Inventor LT process footprint left in the Task Manager, and then run the task again. |
Shrinkwrap Assembly
Log file items for shrinkwrap operations are common to all tasks.
Messages display to explain the nature of any failures.
The Task Summary in the log file shows how many files are processed and how many of them failed. A summary of failed files is included.
The last entry is the task end date and time.
Purge Task
Error messages | Recommended action |
| Purge success. | All unused materials, appearances, and styles in the specified document are purged successfully. |
| Skipped purge of this document because the document is not checked ou.t | Check out the file or files, and repeat the purge task. |
| Failed to purge all unused materials, appearances, and styles. | Migrate the specified files to your current version of Inventor, and repeat the purge task. |
| Skipped purge because all materials, appearances, and styes in the document are in use. | Verifies that no unused materials, appearances and styles are present in the specified document. |
Sequential Task
The log detail for sequential tasks is the same as all sub-task types. Refer to the log description of each task type.