No headers After creating mass floors, you can create a schedule for them. Use a mass floor schedule to assign usages or to analyze the design. If you change the shape of the mass, the mass floor schedule updates to reflect the changes.
To create a mass floor schedule
- Click View tab
Create panel
Schedules drop-down
(Schedule/Quantities). - In the New Schedule dialog, do the following:
- For Category, click Mass Floor.
If Mass Floor does not display by default, select Show categories from all disciplines.
- For Name, specify the schedule name.
- Select Schedule building components.
- Click OK.
- In the Schedule Properties dialog, do the following:
- On the Fields tab, select the desired fields.
See Selecting Fields for a Schedule.
- Use other tabs to specify filtering, sorting, and formatting of the schedule.
See Specifying Schedule Properties.
- Click OK.
The schedule displays in the drawing area. If you included the Usage field in the schedule, you can assign a usage to each mass floor in the schedule.