The velocity (filling) control profile has been scaled to match an absolute duration time, however the switch-over from velocity to pressure control (packing) has been specified by a time value which is greater than the filling phase duration. Therefore, switch-over to pressure control cannot occur before the cavity is 100% filled.
| File | Size | Date | Attached by | |||
|---|---|---|---|---|---|---|
| ac.menuaro.gif No description | 63 bytes | 09:45, 5 Jun 2012 | contentconnector | Actions | ||
Viewing Details: